Building Bastrop County

The 10-Year Vision

Bastrop County is emerging as the physical backbone of the AI revolution, sitting alongside Tesla, SpaceX, and a next-generation entertainment corridor.

01

The Challenge

Bastrop was growing quickly—over 64% since 2010—but the commercial tax base wasn't keeping pace. Residential property taxes bore the burden of infrastructure and school expansion. The raw land that would eventually become a multibillion-dollar campus was generating only $25,000 a year in tax revenue. Underfunded schools meant teachers were commuting out to Austin, and local students had few local pathways to high-wage tech careers.

02

The Turning Point

When EdgeConneX evaluated 535 sites globally for its next mega-campus, Bastrop's leaders negotiated from a position of strength. They chose maximum economic benefit with minimum community disruption. Unlike massive factories that require thousands of commuters, a data center campus employs about 60 permanent specialized roles per phase—triggering zero housing crises while pouring over $100 million into Bastrop ISD during the abatement period alone.

03

The Corridor

Today, Bastrop County is the heart of the Central Texas Technology Corridor. We are building the AI infrastructure for the nation and advancing toward next-generation chip design and fabrication. Parallel to this, we are fostering a massive film and entertainment capital through Wyldwood and Line204.

We are building a community where your children don't have to leave to build great careers.

The Trajectory

2022

David Glass elected Commissioner Precinct 4

2024

EdgeConneX site selection begins, 535 sites evaluated

2025

EdgeConneX $1.4B campus approved, construction begins

2025

SpaceX/Starlink expands 1M+ sq ft ($280M investment)

2025

Wyldwood Studios breaks ground (75 acres, $111M Phase 1)

2025

Line204 Texas announces 546-acre studio lot

2025

Texas approves $2.5B in media production incentives (SB 22)

2026

EdgeConneX Building 1 completion (June 2026)

2026

Commissioner Glass proposes Regional Economic Development Partners Corporation

2027

Wyldwood Studios opens first two soundstages

2028

EdgeConneX campus approaches full Phase 1 operational

2030+

Greenport Technology Center & Semiconductor Campus phases advance

Future

Full $5B EdgeConneX buildout potential, 2.8M sq ft campus

The Central Texas Corridor

Five miles from Tesla and SpaceX, Bastrop County offers an unprecedented geographically linked ecosystem of space technology, AI processing, and advanced manufacturing.

  • Tesla Gigafactory
    ~5 mi
  • SpaceX / Starlink
    Active
  • The Boring Company
    Active
  • EdgeConneX Data Center Campus
    Cedar Creek
  • Greenport International Technology Center
    NW Bastrop
  • Wyldwood Studios
    FM 1209
  • Line204 Texas
    Colorado River
Interactive map visualization loading...